Optimizing Building Systems for Energy and Carbon Reduction

GDI Ainsworth’s targeted HVAC and pumping upgrades that transformed energy efficiency at a Vancouver mixed-use tower.

Project Details

Location
Vancouver , Canada
Number of Buildings
1 - 270,000 ft² mixed-use facility
System Implemented
HVAC and pumping system optimization, VFD fan retrofits, chilled water system reconfiguration, and control upgrades aligned with BC Hydro’s Power Smart Program
Project Goal
Improve overall energy performance, reduce greenhouse gas emissions, and lower operating costs

Impact at a Glance

Reduced electricity consumption by approximately 35,000 kWh per year
Lowered greenhouse gas emissions by approximately 80 tonnes of CO₂ annually
Delivered $41,500 in annual energy cost savings
Achieved a simple payback of 3.2 years with BC Hydro incentives

Challenge

The building’s chilled water and air-handling systems were operating on constant-volume control strategies designed for peak retail demand, resulting in excessive pumping energy, chilled water blending, and unnecessary electrical consumption. Additionally, constant-speed return fans created negative pressure conditions on multiple floors, driving further inefficiencies. Burrard International Holdings required a solution that could improve performance while aligning with BC Hydro’s Power Smart Program requirements.

Methodology

Assessed chilled water distribution, pumping strategies, and air-handling performance
Identified inefficiencies caused by constant-volume operation and system blending
Evaluated pressure imbalances and fan control limitations
Designed targeted ECMs aligned with Power Smart program criteria
Implemented solutions focused on controllability, turndown, and after-hours optimization

Solution

Added control valves to allow chilled water flow modulation
Reduced chilled water pump speed during after-hours operation
Implemented minimum-flow operation after 6:00 p.m.
Re-routed chilled water piping to eliminate return-to-supply blending
Retrofitted supply and return fans with VFDs
Enabled fan systems to maintain pressure setpoints at 50% of design airflow
Optimized system sequencing to reduce pumping demand and electrical load

The Ripple Effect

Lower operating costs free capital for reinvestment across the property portfolio
Reduced carbon emissions support broader sustainability and decarbonization goals
Improved system controllability enhances long-term asset performance
Incentive-aligned upgrades provide a replicable model for future retrofits
You May Also Like
Guy_Favreau
 Pulse Oximeter showing Pulse. Anonymous Nurse Checks Vitals of Woman Getting well after Surgery
Rectangle 20 (1)

Partner with the industry’s best for exceptional janitorial and commercial cleaning services.

Our premium janitorial services will redefine your facility. Regardless of the facility service you need or your location, we’re eager to discuss your needs. Complete the form and one of our experts will be in touch soon.

Our Industries

A century of experience

A future of innovation

GDI's Story Begins

Robertson Janitorial Ltd. began as a small, reliable cleaning service supporting Quebec City’s growing economic landscape. With a focus on consistency and care, the company steadily grew. 

Ainsworth is Founded

Brothers F.C. and C.J. Ainsworth establish an electrical services company that grows into a technical services leader.  

Two Leaders Join Forces

GDI acquires Ainsworth, bringing facility and technical services together in one North American organization.

Celebrating 100 Years

GDI and Ainsworth are uniting under the name GDI Ainsworth: one company, one culture, and one vision for the future.

Thank you for being part of our journey.
Together, we're ready for the next 100 years.